by Gary Elliott | Feb 24, 2022 | Case Studies
Lightcliffe Primary School, Daily Mile Product: Daily Mile Budget: £15,000 Brief: The client was looking for a daily mile track to be installed in their playing field. They wanted to encourage the children to be more active and wanted to be a part of the Daily Mile...
by Gary Elliott | Feb 24, 2022 | Case Studies, SUDs Bond
Dartford Golf Club, Pathway Surfacing Product: Pathway Surfacing Budget: £10,000 Brief: The client was looking to upgrade the pathway from the Clubhouse to the first fairway as the existing pathway was hard to use during winter months and prone to puddles/ice risks...
by Gary Elliott | Feb 24, 2022 | Case Studies, Wet Pour
Devonshire Primary Academy, Play Surfacing Product: Play Area Surfacing Budget: £100,000 Brief: Devonshire Primary Academy School wanted to transform their playground by adding wet pour surfacing with various colours and play equipment. They requested that their area...
by Gary Elliott | Feb 23, 2022 | Case Studies, Wet Pour
Ashby and Lamas Splash Park Product: Water Park Surfacing Budget: £60,000 + VAT Brief: The client were looking to refurbish their exisiting splash park as the surface had become old, dirty and covered in algae. Surfacing Installed: Wet pour was laid at 20mm in black...
by Gary Elliott | Oct 12, 2017 | Case Studies, Wet Pour
Wilton Lodge Adventure Playground, Play Surfacing Product: Play Area Surfacing Budget: £87,000 Brief: To install safety surfacing to the clients chosen design supplied by the appointed Play Providers. The design incorporates many colours, graphics and mounds to...
by Gary Elliott | Oct 3, 2017 | Case Studies, Wet Pour
Cherry Orchard Academy, Kent, Wet Pour Product: Wetpour Safety Surfacing Budget: £15,000 Brief: A state of the art two-form entry primary academy opening in September 2017. Located at the Ebbsfleet Garden city development in Kent. The architects wanted to...